This section deals with whether or not a building consent will be required prior to carrying out building work. There are three areas that should be considered – Building work that is:
- Exempt under Schedule one of the Building Act 2004
- Carried out under urgency and requires a Certificate of Acceptance
- Required as part of changing the Building Use
For information about these topics, see above links